Rough-in positions set from the finished layout, so fixture heights and centres suit the room rather than wherever the existing pipes happened to run.

Copper and PEX supply lines roughed into an open stud wall with a shower valve set to height

Rough-in positions are set from the finished layout, so fixture heights and centres suit the room rather than wherever the existing pipes happened to run.

  • Licensed & insured
  • WorkSafeBC coverage
  • Written quotes & contracts
  • Built to BC Building Code

What this covers

Bathroom Plumbing & Fixtures

The plumbing rough-in is the stage that decides how a bathroom feels to use, and it happens weeks before anyone can see it. Every fixture centre, every valve height, every waste position gets committed while the walls are open, and once the tile is on, those decisions are permanent in a way that almost nothing else in the room is. A tap can be swapped in an afternoon. The hole it comes through cannot.

Setting the rough-in from the finished layout. The default approach — reuse the existing pipe positions and place fixtures wherever they land — is how a toilet ends up 380mm off a side wall instead of 450mm, how a shower valve sits at the height that suited the previous owner, and how a basin ends up off-centre in its alcove because that is where the old stub was. Working the other way round, the finished layout is drawn first and the rough-in set to serve it: toilet centre at the right distance from both walls, basin waste centred on the cabinet and low enough that the trap does not consume the top drawer, and valve and head heights set to the people who use the room.

Drainage is governed by physics and by code. Waste pipes need continuous fall — a quarter inch per foot is the working figure for a three-inch line — and every trap needs venting or it siphons and lets sewer gas into the room. Trap arm lengths are limited by code according to pipe size for exactly that reason. Where a fixture moves beyond the reach of the existing vent, either a new vent is run to connect above the flood level rim, or an air admittance valve is used where code and the local authority permit it. This is the part of a layout change that decides whether it is straightforward or substantial, and it is worked out from joist direction and stack location before the layout is finalised.

Older island housing has predictable plumbing. Galvanised steel supply lines in homes from the middle of the last century corrode from the inside; by the time the pressure drop is noticeable the bore is significantly reduced, and reconnecting new fixtures to an old galvanised branch simply hands the new bathroom an old problem. Cast-iron waste stacks are often still serviceable and quieter than plastic, but their hubbed joints need the right connection method. Polybutylene supply is a known failure risk. What is behind the wall is established during assessment rather than assumed, because it changes both the scope and the sequence.

Toilets. Rough-in distance — finished wall to the centre of the waste — is most often 305mm in North American housing, but 254mm and 356mm both exist, and buying the wrong one is a common and avoidable error. Wall-hung toilets need a carrier frame inside the wall, which means a thicker partition and a decision made at framing, but they free the floor beneath for cleaning and read well in a small room. Comfort-height pans cost nothing extra to specify and are worth considering for anyone expecting to stay in the house.

Faucets, showers and diverters. A wall-mounted basin faucet requires the valve body set in the wall at a height and projection that suits a basin chosen before the walls close — get the projection wrong and the water lands on the rim instead of in the bowl. A thermostatic shower valve holds temperature when another fixture in the house draws water, which matters most in a household where someone is showering while the laundry runs. A diverter serving both a fixed head and a handheld on a rail is one of the genuinely useful upgrades in any bathroom: it makes cleaning the shower possible, makes rinsing a child or a dog practical, and is the single most valuable fitting in an accessible shower. Rain heads need the supply pipe sized and the flow rate checked, because a large head on a marginal supply produces a disappointing drizzle.

Fixture upgrades without a full renovation. Replacing a toilet, a faucet set, a shower trim or a set of angle stops is a legitimate scope on its own, and frequently the sensible one. The limits are worth being clear about: trim replacement is easy, but changing to a different valve manufacturer usually means opening the wall behind the shower, because valve bodies are not interchangeable. A new basin often needs a new faucet if the hole spread differs. These get established before the work is quoted, not on the day.

Commissioning. Every joint is pressure-checked, every trap filled and tested, every fixture run and every isolation stop confirmed to actually isolate, with rough-in inspected where the permit scope requires it before the walls close.

Why it matters

What you get

Centres and heights set to the room

Toilet centres, basin waste height and valve positions are set from the finished layout rather than inherited from the pipework that happened to be there.

Venting resolved before the layout is fixed

Trap arm limits, vent connections and stack access are worked out against joist direction early, because they decide whether a layout change is simple or substantial.

Old supply lines identified, not inherited

Galvanised, polybutylene and undersized branches are found during assessment so a new bathroom is not connected to an old problem.

Valve choices matched to the household

Thermostatic control where other fixtures draw water mid-shower, and diverters specified so a handheld is available alongside a fixed head.

Handhelds treated as standard, not an extra

A handheld on a rail makes the shower cleanable, makes rinsing practical and is the most useful single fitting in an accessible bathroom.

Tested before the walls close

Joints are pressure-checked, traps filled and tested and isolation stops confirmed, with rough-in inspected where the permit scope requires it.

How it runs

The process

  1. 01

    Locate what is actually there

    The stack, existing vents, supply material, shut-off points and joist direction are established before any layout change is committed to.

  2. 02

    Set the rough-in from the drawing

    Fixture centres, waste positions and valve heights are marked from the finished layout and confirmed against the specified fixtures.

  3. 03

    Reconfigure drainage and venting

    Waste lines are re-run at the required fall with venting resolved to code, and supply is renewed where the existing material warrants it.

  4. 04

    Rough-in and inspection

    Supply and waste are installed, pressure-tested and left open for inspection where the permit scope calls for it, before the walls are closed.

  5. 05

    Fixture installation

    Toilets, basins, faucets, shower trim, heads and handhelds are set once the finished surfaces are complete.

  6. 06

    Commissioning and check

    Every fixture is run, drainage confirmed, isolation stops operated, and connections checked again after the first day of use.

Get the pipework set to the room, not the other way round

Fixture centres, valve heights and drainage routes are worked out from the finished layout before anything is roughed in.

Questions

Frequently asked

Usually, but the cost turns on structure rather than plumbing. A toilet needs a three-inch drain running at a quarter inch per foot to a stack, plus venting within the trap arm length the code allows. If the floor joists run in the direction the pipe needs to travel, it is often straightforward. If they run across it, the pipe has to get around them — which can mean a bulkhead below, dropping a ceiling, or in some cases the move not being worth doing. The assessment happens at the measure stage so the choice is made with the cost visible.

If the bathroom has galvanised supply lines, an open wall is by far the cheapest opportunity you will ever have to change them. Galvanised steel corrodes from the inside and the bore narrows over decades, so connecting new fixtures to an old branch means new taps fed by a restricted line. Whether the replacement stops at the bathroom branch or extends further back toward the main depends on what is accessible, and that gets scoped and priced in writing rather than decided mid-job.

There is no single correct figure, which is exactly why it is worth deciding rather than defaulting. A valve is commonly set somewhere around 1,000–1,200mm so it can be reached from outside the spray, and a fixed head is typically set above the tallest regular user's height — often around 2,000mm, higher than most existing showers. A slide rail with a handheld makes the fixed height less critical because it serves everyone. These get confirmed against the people who use the room before the pipework is set.

If you are staying with the same manufacturer and a compatible valve body, yes — the trim comes off and the new one goes on. Changing brands almost always means changing the valve body, because cartridges and mounting are not interchangeable between manufacturers, and that means opening the wall behind the valve. In a tiled shower that means cutting tile, which is why a trim change is usually considered alongside any wider plans for the room.

Because a pressure-balancing valve is compensating for a sudden pressure drop on the cold side by cutting the hot flow, or because the existing valve has no compensation at all. A thermostatic valve holds the set temperature by adjusting the mix rather than by throttling flow, which handles it far better. Undersized or restricted supply lines make the problem worse, so the pipe material and diameter feeding the bathroom is checked at the same time rather than only the valve.

Relocating drainage or altering venting generally does, while replacing fixtures in existing positions generally does not. Requirements vary between the City of Nanaimo, the Regional District of Nanaimo and the municipalities up and down the highway, so it is confirmed against the specific scope. Where a permit applies, it is coordinated as part of the job and the rough-in inspection is scheduled into the sequence so the walls are not closed before it happens.