Skip to content
Nanaimo Custom Bathrooms

Bathroom renovation services

Bathroom Remodeling & Renovations

Full and partial bathroom renovations across Nanaimo, Lantzville, Nanoose Bay, Parksville and Qualicum Beach — planned and priced as one scope before anything is opened up.

A renovated bathroom with a dark stone-tiled walk-in shower behind a frameless glass panel, a floating oak vanity and aged brass fixtures

The whole room is planned and priced as one scope, itemised in writing before work begins, so changes are priced as they come up rather than settled at the end.

  • Licensed & insured
  • WorkSafeBC coverage
  • Written quotes & contracts
  • Built to BC Building Code

What this covers

Bathroom Remodeling & Renovations

A bathroom renovation is the most trade-dense project a house of this size will ever see. Demolition, framing, plumbing, electrical, insulation, vapour control, waterproofing, tile, cabinetry, stone, glass, paint and finish hardware all have to land in one small room, in a fixed order, where each stage buries the one before it. That sequence is the reason bathrooms go wrong. It is also the reason a bathroom is worth planning as a single scope rather than a series of decisions made as the room opens up.

What "full remodel" actually means. A full bathroom remodel takes the room back to studs and subfloor. Everything downstream of that — the fixture layout, the shower footprint, the vanity width, the position of the light switch — is open. That freedom is what makes a full remodel worth doing, but it only pays off if the drawing is resolved before demolition starts, because the walls are open for a matter of days and every decision deferred into that window becomes a decision made under time pressure.

Partial renovations are a different discipline. A partial bathroom renovation works around what stays. Keeping a tub, keeping the tile floor, keeping the existing drain positions — each of these sets constraints that the new work has to meet exactly, and matching into existing finishes is often more exacting than replacing them. A tub-to-shower swap that reuses the existing drain, a vanity and top replacement in a room whose floor is staying, a repaint and re-tile with the plumbing untouched: these are real scopes with real value, and they need the same written definition a full remodel gets.

Layout changes are a structural question first. Moving a toilet is not a plumbing decision, it is a floor-framing decision. A toilet needs a three-inch drain running to a stack at a fall of roughly a quarter inch per foot, plus venting, and where that pipe can run depends entirely on which way the joists run beneath it and how much depth is available between them. In a Nanaimo post-and-beam or a 1950s bungalow with a finished ceiling below, that answer changes what the reconfiguration costs and sometimes whether it is worth doing. Relocating a shower, converting a linen closet into a shower alcove, borrowing depth from an adjacent bedroom wall — all of it is possible, and all of it is worth pricing honestly before it is drawn.

The rooms are not interchangeable. A powder room renovation is a small room where every surface is at eye level and nothing hides — the tile layout, the reveal on the vanity, the ceiling line. A family bathroom takes the hardest service life in the house: a tub that gets used daily, storage that has to actually hold things, ventilation that keeps up with back-to-back showers. An ensuite is a quieter brief, usually about a larger shower, a double vanity and a layout that works in the dark at six in the morning. A condo bathroom renovation is defined by the building before it is defined by the design: concrete slabs that cannot be cored, plumbing shut-downs scheduled with the building manager, elevator bookings, work-hour windows and a strata approval process that has to be cleared before anything is booked.

Older island housing stock has its own habits. Homes across Nanaimo, Ladysmith and Chemainus were built across a wide span of decades, and a bathroom in each generation was built to the standard of its day. Cast-iron waste, galvanised supply, undersized venting, framing that has moved, floors that are not level, and wall cavities that were never insulated for a modern bathroom's humidity are all normal findings rather than surprises. Planning a remodel means allowing for what the era suggests is likely behind the wall, and pricing the work for what is found rather than discovering it after the scope is fixed.

How the scope is handled. The whole room is quoted as one itemised scope in writing, and the sequence of work is set out in the contract. When something has to change — a homeowner's choice, or a condition that only became visible once the walls were open — it is priced at the time it comes up, in writing, rather than accumulated and settled at the end. Bathrooms are the specialty here; other renovation work across the house is available on request, and it is often sensible to look at an adjoining hallway, laundry or closet at the same time while the floor is already up.

Why it matters

What you get

One scope, itemised in writing

Demolition through final finishing is quoted as a single scope rather than a running tally, with the line items visible before the first wall is opened.

Layout changes priced honestly

Moving a toilet, shower or wall is assessed against joist direction, drain fall and venting before it is drawn, so the cost of a reconfiguration is known while it is still a choice.

Built to the room you have

Shower openings, vanity runs, niches and benches are made to the actual dimensions of the room rather than the room being reshaped around stock units.

Sequenced to keep the trades in order

Rough-in, inspection, waterproofing, tile and finish are staged so nothing has to be reopened, which is what keeps a small room from stalling for weeks.

Coastal-climate assemblies

Wall build-ups, vapour control and ventilation are specified for a wet island climate rather than to a generic spec that suits a drier interior.

Older-home conditions anticipated

Galvanised supply, cast-iron waste, undersized venting and out-of-level floors are treated as likely findings in mid-century island housing, not as afterthoughts.

How it runs

The process

  1. 01

    Consultation on site

    The room is measured and the existing plumbing, framing, venting and access are assessed. What you want out of the space is discussed against what the structure allows.

  2. 02

    Layout and scope development

    A layout is worked up against real clearances and the practical routes for drain, vent and supply. Finishes and fixtures are specified to a level of detail the quote can actually price.

  3. 03

    Itemised written quote and contract

    The scope is set out line by line in writing, with the construction sequence and the change-pricing process written into the contract before anything is booked.

  4. 04

    Demolition and rough-in

    The room is stripped back, protection is set through the house, and framing, plumbing and electrical rough-in are completed and inspected where the scope requires it.

  5. 05

    Waterproofing, tile and cabinetry

    Waterproofing is detailed and checked before tile covers it. Cabinetry is set, tops are templated to the installed cabinets, then tile, glass and stone follow.

  6. 06

    Finishing and handover

    Fixtures, trim, paint, mirrors and hardware go in, the room is cleaned, and the finished work is walked through with you against the written scope.

Planning a bathroom renovation in Nanaimo?

Start with a site visit and a measured look at what the room and the structure will allow, then an itemised written scope.

Questions

Frequently asked

A full remodel of a single bathroom typically runs several weeks from demolition to handover, with the room unusable for essentially all of it. The long poles are the curing and inspection gaps rather than the labour — waterproofing has to cure before tile, thinset and grout before glass, and a rough-in inspection has to happen before walls close. A partial renovation that keeps the plumbing where it is can be considerably shorter. The realistic duration for your specific scope is discussed before the contract is signed, not after demolition.

Layout changes are usually possible, but the cost varies enormously depending on the structure. Moving a vanity or a shower head is straightforward. Moving a toilet means running a three-inch drain at the required fall to an existing stack, and whether that is easy or expensive depends on which direction the floor joists run and how much depth is available. If there is a finished ceiling below, the access route matters too. This is assessed on the first visit so the decision is made with the cost in front of you.

Most single-bathroom households arrange alternatives for the duration — a family member's house, a nearby rental, or a temporary shower elsewhere. Where the plumbing allows, the toilet can sometimes be reinstated at the end of each working day for part of the schedule, but this is not possible once the drain is opened or the floor is out. It is worth planning the timing around this constraint rather than around the calendar, and the schedule is set out in writing so you can arrange around it.

Bathroom renovations produce dust, and the demolition stage produces a lot of it. Floor protection is run along the access route, and the doorway is sealed off so the working area is contained. Debris is removed rather than stockpiled on site. Water and power to the bathroom are isolated where possible so the rest of the house keeps running normally, though there will be short shut-downs at specific points in the plumbing work.

It depends on scope. Replacing fixtures and finishes in the same positions generally does not trigger a permit. Moving plumbing, altering structure, adding circuits or changing the room's footprint usually does, and requirements differ between the City of Nanaimo, the Regional District of Nanaimo and the municipalities further up and down the highway. Where the scope calls for a permit, it is coordinated as part of the job and the inspection points are built into the schedule.

Yes, with the building's process factored in from the start. Most stratas require an alteration request with drawings and contractor insurance details approved before work begins, and many restrict working hours, elevator use and material access. Concrete slab construction also limits what can be moved, since drains generally cannot be re-cored. These constraints are worked into the layout and the schedule rather than discovered midway.